Walk the site before equipment arrives
Tour the property with the project lead and identify what is directly below the work. Include planting beds, shrubs, small trees, delicate paving, outdoor lighting, irrigation components and features that may be difficult to see from a driveway. Ask which areas are expected to receive foot traffic or temporary protection.
Take dated photographs from ordinary ground-level viewpoints. The purpose is to create a shared record of existing conditions, not to predict that damage will occur. Photographs also make it easier to explain concerns if different crew members arrive on installation day.
Separate movable items from fixed features
Move lightweight planters, cushions, garden ornaments and other manageable belongings to an agreed location outside the work zone. Discuss larger or fragile objects with the contractor rather than trying to lift them without help. Label anything that may be mistaken for disposable material.
For features that cannot move, ask what protection is proposed and where its supports will rest. A plan should account for the plants themselves, not simply cover the general area. If you have a particularly valuable specimen or a sensitive planting bed, identify it specifically so its importance is not lost in a broad instruction to protect the yard.
Agree on routes and temporary restrictions
Decide which path workers and materials will use and which areas should remain off limits. Mark hidden irrigation heads or similar features with the contractor’s agreement before work starts. Tell the project lead about gates that must remain closed and any shared boundary where access needs coordination.
Discuss when protective coverings will be put in place, monitored and removed. Ask what happens if the schedule extends or weather changes. Do not move a covering or barrier during active work without speaking to the crew; it may be part of the protection or safety arrangement.
Make cleanup specific to the surfaces
Ask how planting beds, mulched borders and access routes will be checked after protection is removed. Compare any concerns with the pre-work photographs. For the full handover and site-cleanup sequence, use the final-walkthrough guide linked below.
Your yard-protection worksheet
Feature and location: ____ Movable or fixed: ____ Protection or agreed exclusion: ____ Person confirming the plan: ____ Photo reference before work: ____
Should I move everything in the yard?
Focus on the agreed work and access areas. Discuss heavy or fixed features with the contractor rather than moving them unsafely.
Can protective tarps stay in place indefinitely?
Do not assume so. Ask how coverings will be monitored and removed if weather or the schedule changes.
Does a magnetic sweep find all roofing debris?
No. It does not capture every material or reach every location. Ask for a broader cleanup check appropriate to each surface.
Sources & further reading
General educational information. A property assessment and written scope determine appropriate work; this article does not establish pricing, availability or coverage.
Discuss your roof →Related reading
Managing a Roof Project When You Cannot Be on Site
Set up clear project photos, remote decisions, access arrangements, and closeout records when the property owner cannot attend roofing work.
The Roofing Final Walkthrough: A Practical Handover and Cleanup Checklist
The final walkthrough should explain what was installed, what remains to be done and when the property is ready for normal use.
Living at Home During Reroofing: A Plan for Noise, Pets and Daily Routines
The right household plan depends on who is home, which spaces they need and how the work area will be controlled.